Not architecture with a safety department attached. Not expediting with drafting bolted on. Site safety plans, DOT permits, and agency approvals, and nothing else. That is the whole business, and it is why the plans clear.
Small jobs where the plan still has to be right, and where a rejected filing costs a builder weeks they cannot absorb.
Major buildings where the plan goes to DOB for approval and every condition on the site has to be accounted for on the sheet.
Hundreds of filings across every borough means we are not figuring out your project from scratch. We have drawn the condition before. We know what the sheet needs to show, and we know what the examiner is going to look for when it lands on their desk.
Most delays are not complicated. They are the same handful of objections, raised over and over, on plans that were filed without anticipating them. We file to clear on the first pass, and when an objection does come back, we already know what it wants.
If the filing is going to be difficult, you hear it before you hire us, not after. If a waiver is unlikely to be granted, we say so. You get a scope, a price, and an honest read on what the agency is going to do with it.
Call us and we pick up. Email us and you hear back the same day, not the next week. New York construction does not wait for anybody, and neither do we.
You should not have to ask where a filing stands. You should not have to follow up twice. We stay a step ahead of the job, so that when the schedule shifts or the agency comes back with something, the answer is already moving before you have picked up the phone.